Fuel Use Savings Report

for

Manufacturing Facility

Grandview, Missouri

 

PROJECT HISTORY

In November 1992, (3) THERMO-CYCLER® Gas Fired Heating Units and a TM-480 THERMO-MIXER® THERMO-Mixer® Ventilation Air System were selected by this leading manufacturer of industrial controls and instrumentation for the new pre-engineered facility located in Grandview, Missouri. The state-of-the-art facility is fully air conditioned and had less than a 3 degree actual temperature difference when tested at design conditions.

Total Area: 49,500 SQ. FT. (270' x 180' includes 4,250 SQ. FT. office)
Average Height: 28 Ft.
Overhead Doors: 3 Overhead Doors
Wall Construction: Lower 10' Fulled Block, Upper Pre-eng w/ R-19 Insulation
Roof Construction: Pre-eng w/ R-30 Insulation
Building Usage: Manufacturing and Warehouse


93-94 Gas Usage & Cost


BOTTOM LINE

Billing Period Gas Consumption Fuel Cost
Sept 20-Oct 19, 1993 0 Mcf $25.36
Oct 19-Nov 18, 1993 23 Mcf $121.57
Nov 18-Dec 20, 1993 64 Mcf $342.74
Dec 20-Jan 21, 1993 150 Mcf $836.21
Jan 21-Feb 18, 1994 93 Mcf $501.84
Feb 18-March 22, 1994 48 Mcf $259.26
March 22-April 21, 1994 4 Mcf $29.66
April 21-May 20, 1994 10 Mcf $53.47
May 20-June 21, 1994 0 Mcf $10.32
93-94 Heating Season Total 392 Mcf $2,180.43($5.56/Mcf)

Energy efficient heat recovery and air distribution by the Thermo-Cycler Heating System allows this leading control and instrumentation manufacturer to comfortably heat nearly 50,000 sq. ft. of manufacturing/warehouse space for an average seasonal heating cost of less than 4 1/2 cents per square foot based on a natural gas cost of $5.56 per Mcf.

( DWY294web)