Fuel Use Savings Report

for

HVAC Shop & Office

Carlisle, Iowa

 

PROJECT HISTORY

In September 2002, (1) THERMO-CYCLER® GTC-300 Gas Fired Heating Unit was installed in this new shop & office building for a HVAC Contractor. Approximately 72% of the building was shop area heated by the 200 Mbh Thermo-Cycler and 28% was heated by a 100 Mbh 92% high efficiency furnace.

Total Area: 6,240 SQ. FT. (104'x60')
Shop Area: 4,500 SQ. FT. (75'x60') Office Area: 1,740 SQ. FT. (29'x60')
Average Height: 14 Ft.
Overhead Doors: 2 Overhead Doors
Wall Construction: Metal Building with R-13 Insulation
Roof Construction: Metal Building with R-38 Insulation
Inside Design: 65 Degrees
Building Usage: HVAC Shop & Office


2002-2003 Gas Usage & Cost

Billing Period Gas Consumption Fuel Cost
11/22-12/27/02 340 Ccf $232
12/27-1/28/03 427 Ccf $318
1/28-2/28/03 404 Ccf $341
3/1-3/31/03 218 Ccf $247
4/1-4/30/03 106 Ccf $103
5/1-5/31/03 21 Ccf $28
6/1-6/30/03 4 Ccf $14
2002-2003 Heating Season Total 1520 Ccf $1283 ($.84/Ccf)


BOTTOM LINE


During the first full season of operation, energy efficient recovery of all internal sources of heat gain by THERMO-CYCLER System resulted in a seasonal heating cost of 20.6 cents per square foot based on an average gas cost of $8.40 per Mcf. According to the building owner, "Recovery time is just so quick it is unbelievable."