|
Fuel Use Savings Report for HVAC Shop & Office Carlisle, Iowa |
In September 2002, (1) THERMO-CYCLER® GTC-300 Gas Fired Heating Unit was installed in this new shop & office building for a HVAC Contractor. Approximately 72% of the building was shop area heated by the 200 Mbh Thermo-Cycler and 28% was heated by a 100 Mbh 92% high efficiency furnace.
|
Total Area: 6,240 SQ. FT. (104'x60') |
|||||||||||||||||||||||||||||||||
|
(SUP104web) |